Vibration Assessment - PlanningCore.uk

Vibration Assessment

BS 5228-2 & BS 6472-1 construction and operational vibration screening

Source and Propagation

Distance in metres from source to nearest sensitive receptor
Affects vibration attenuation and amplification
Optional, default 0.3 mm/s

Receiver Sensitivity

BS 6472-1 receiver categories
BS 5228-2 building damage thresholds

Mitigation Measures

Select all applicable mitigation measures to reduce predicted vibration levels

Isolation pads, springs, or mounts (40% reduction)
Replace with quieter technique (50% reduction)
Cut-off trench or barrier walls (30% reduction)
No work during sensitive periods (management measure)
On-site monitoring with alert thresholds (management measure)
Reduce source intensity per phase (15% reduction)
Document baseline condition before works (management measure)
Advance notice and liaison officer (management measure)

Assessment Results

Source and Propagation Analysis

Source PPV at 10m Reference Distance
—
—
Attenuation Exponent
—
—
Predicted PPV at Receiver
—
Before mitigation
Attenuation Stage Calculation PPV (mm/s)

Human Perception Assessment (BS 6472-1)

Perception Level
—
—
Perception Category Threshold (mm/s) Status

Building Damage Risk Assessment (BS 5228-2)

Damage Risk Category
—
—
Damage Category Threshold (mm/s) Status

Vibration Dose Value (VDV)

Duration Factor
—
VDV Calculation
—
PPV × Duration Factor × 0.7

Mitigation Measures Applied

PPV After Mitigation
—
—

Recommended Planning Conditions

    Note: This assessment is a screening tool based on BS 5228-2:2009 and BS 6472-1:2008. Detailed baseline vibration surveys and post-completion monitoring may be required. Conditions should be tailored to site-specific constraints and refined during detailed design phase.

    About this tool: Vibration

    BS 6472 / BS 5228 vibration screening — ground-borne vibration from railways, industry and construction, with human comfort thresholds.

    When to use it

    Use for sites near railways, industrial plant or busy roads, or where piling and demolition are proposed close to neighbours.

    Policy and guidance it draws on

    BS 6472-1:2008, BS 5228-2:2009

    Part of Environmental Intelligence

    Use these tools when preparing technical reports and compliance documentation. Many of these are validation requirements — submit without them and your application will be returned. Use the Validation Pre-Flight tool to check which ones you actually need.

    Related tools
    Energy StatementSustainabilityDrainage StrategyFire SafetyWater EfficiencyWaste ManagementOverheatingOdour Impact

    Guidance to help you prepare — not formal planning advice. Check the current policy text and your council's local plan before relying on it.

    Ask Planning Agent
    🧭Guide me