📚 Planning Library › 📋 Policy › NPPF N2: Improving the natural environment
📋 Policy

NPPF N2: Improving the natural environment

gov.uk · 🏴󠁧󠁢󠁥󠁮󠁧󠁿 England

Latest version → August 2026 framework
🔗 View original

N2: Improving the natural environment 1. To contribute positively to the natural environment, and support nature’s recovery, development proposals should: a. Consider the environmental qualities of land proposed for development, including habitats, landscape character and the natural beauty of the countryside, and identify opportunities for those qualities to be conserved or enhanced (including through requirements for biodiversity net gain where these apply); b. Take into account the quality of agricultural land (including that classified as best and most versatile agricultural land, and its grade), and if significant development of agricultural land is necessary, use areas of poorer quality land where possible; c. Take suitable opportunities to connect to and strengthen ecological networks that extend beyond the site, drawing on the measures proposed by Local Nature Recovery Strategies, National Forest Strategies and Community Forest Plans, where present, and other relevant assessments; d. Conserve and enhance existing natural features of visual, historic or nature conservation value (such as established trees and hedgerows) where possible; and use appropriate landscaping to help create a well-designed place and integrate the development into its surroundings; e. Use green infrastructure provided as part of the scheme and nature-based solutions to secure multiple benefits: such as for biodiversity; surface water and pollution management (including maintaining flow rates and water quality); climate change mitigation and adaptation, and recreation; f. Minimise any adverse impacts on biodiversity and include features which support priority or threatened species such as swifts, bats and hedgehogs. Development proposals should incorporate integrated nest boxes (commonly known as swift bricks) into their construction unless there are compelling technical reasons which prevent their use, or would make them ineffective; and g. Ensure that green infrastructure and other features to support nature are located and designed to minimise risk of future failure, and that appropriate measures are in place for any necessary long-term management. 2. If significant harm to biodiversity resulting from a development cannot be avoided (through locating on an alternative site with less harmful impacts), adequately mitigated or, as a last resort, compensated for, then the development should be refused. 3. Development proposals may incorporate biodiversity enhancements which exceed the statutory objective for biodiversity net gain, but this should only be a requirement where it 90 is set out in up-to-date development plan policies for specific site allocations. Decision- makers should not give weight to other development plan policies which require biodiversity gains which go beyond the statutory framework, including where a policy requires gains for development proposals which are exempt.

Working on a live application?

Save this policy document to a case and it is carried into the Planning Statement, appeal statement and other documents PlanningCore drafts for you — cited by name.

Create a free case Already have an account? Sign in

Document details

Type 📋 Policy
Source gov.uk
Jurisdiction 🏴󠁧󠁢󠁥󠁮󠁧󠁿 England
Status Active
Published 2026-08-17
Effective 2026-08-17

Alerts

Get notified when this document changes.

Not following

📋 Copy with citations

Generate citation-grade text for your planning submission or appeal.

Select a style above to generate citation-grade text.
Ask Planning Agent
🧭Guide me