📚 Planning Library › 📋 Policy › NPPF N1: Identifying environmental opportunities and safeguards
📋 Policy

NPPF N1: Identifying environmental opportunities and safeguards

gov.uk · 🏴󠁧󠁢󠁥󠁮󠁧󠁿 England

Latest version → August 2026 framework
🔗 View original

N1: Identifying environmental opportunities and safeguards 1. Development plans should safeguard and enhance the natural environment, and reflect the wider benefits from natural capital and ecosystem services, by using Local Nature Recovery Strategies, Protected Landscape Management Plans, River Basin Management Plans, National Forest Strategies, Community Forest Plans and other relevant evidence at the most appropriate level to: a. Set out the hierarchy of international, national and locally designated sites and areas of importance for their landscape, geodiversity or biodiversity value in the plan area, and identify other features which require particular consideration in managing development due to their environmental value such as chalk streams; b. Identify opportunities for the conservation, enhancement and recovery of landscapes, sensitive waterbodies, habitats and priority or threatened species, including through habitat restoration, the use of nature-based solutions, and the creation and strengthening of ecological networks that are more resilient to current and future pressures (including opportunities which exist at a catchment or landscape scale across plan boundaries); c. Steer the location of development, including through site allocations, in ways which utilise land of least environmental value where that would be consistent with other policies in this Framework. This should include limiting the scale and extent of development within Protected Landscapes, avoiding the use of higher quality agricultural land where land of poorer quality is available and avoiding and minimising harm to designated sites of importance for nature. Areas which could become of particular importance for nature identified in Local Nature Recovery Strategies should be taken into account as opportunities to integrate development with environmental restoration, but should not necessarily preclude the allocation of land for development; and d. Set out standards for green infrastructure provision, in a way which complements and/or incorporates those for recreational land (as set out in policy HC1). These should draw upon Natural England’s Green Infrastructure Standards for England58, tailored as necessary to local circumstances. Natural England’s Green Infrastructure Standards for England published in: https://designatedsites.naturalengland.org.uk/GreenInfrastructure/GIStandards.aspx 89 2. Development plans should only set local standards for biodiversity net gain which are in excess of the statutory net gain requirement where this is for specific site allocations, and is fully justified and deliverable. Local standards should not extend to categories of development which are exempt from statutory biodiversity net gain. National decision-making policies

Working on a live application?

Save this policy document to a case and it is carried into the Planning Statement, appeal statement and other documents PlanningCore drafts for you — cited by name.

Create a free case Already have an account? Sign in

Document details

Type 📋 Policy
Source gov.uk
Jurisdiction 🏴󠁧󠁢󠁥󠁮󠁧󠁿 England
Status Active
Published 2026-08-17
Effective 2026-08-17

Alerts

Get notified when this document changes.

Not following

📋 Copy with citations

Generate citation-grade text for your planning submission or appeal.

Select a style above to generate citation-grade text.
Ask Planning Agent
🧭Guide me