🏗️ Building Regulations Guide
Building Regulations are NOT the same as Planning Permission. You often need both. This guide explains what Building Regs cover and when you need approval.
📋 Planning Permission
Controls WHETHER you can build
- ✅ What the building looks like
- ✅ Where it's positioned on the site
- ✅ How it affects neighbours
- ✅ Impact on the local area
- ✅ Design, materials, height
- ✅ Policy compliance
- ❌ Does NOT check structure
- ❌ Does NOT check fire safety
🏗️ Building Regulations
Controls HOW you build
- ✅ Structural safety (won't fall down)
- ✅ Fire safety (escape routes, alarms)
- ✅ Energy efficiency (insulation, EPC)
- ✅ Drainage and waste
- ✅ Ventilation and damp
- ✅ Electrical and gas safety
- ❌ Does NOT check design/appearance
- ❌ Does NOT check neighbour impact
📚 The Building Regulation Parts (A-S)
🔨 What Needs Building Regulations Approval?
Needs Building Regs ✅
- Extensions (any size)
- Loft conversions
- Garage conversions
- New buildings (houses, outbuildings with plumbing/electrics)
- Structural alterations (removing walls, new openings)
- New bathrooms/kitchens (drainage, ventilation)
- Replacing windows (unless FENSA registered installer)
- Electrical work (Part P — new circuits, consumer units)
- New heating systems (boilers, heat pumps)
- Underpinning
Usually Exempt ❌
- Small detached buildings under 15 sqm (no sleeping)
- Detached buildings 15-30 sqm (if >1m from boundary, non-combustible)
- Porches under 30 sqm (ground floor, external door maintained)
- Carports (open on at least 2 sides)
- Covered yards and walkways
- Temporary buildings (up to 28 days)
- Greenhouses and agricultural buildings
- Like-for-like repairs (same materials)
- Redecorating and cosmetic changes
💡 Key Points
- You may need BOTH planning permission AND building regulations approval — they are separate systems
- Building Regs is not optional — it's a legal requirement. Work without approval can be enforced against
- You can use Local Authority Building Control or an Approved Inspector (private)
- A Completion Certificate is issued when work passes final inspection — keep this safe for selling your property
- Retrospective approval is possible but expensive — a Regularisation Certificate costs more than applying upfront
- For extensions, start with planning permission (if needed), then submit Building Regs before starting work
About this tool: Building Regulations Guide
Guide to Building Regulations approval — how it differs from planning, the application routes, and the parts most relevant to householder work.
Use to understand the separate Building Regulations consent your project will need alongside planning permission.
Building Act 1984, Building Regulations 2010
Use these tools when designing your scheme or reviewing drawings. They help ensure your proposal meets technical standards before submission, reducing the risk of officer objections on design grounds.
Guidance to help you prepare — not formal planning advice. Check the current policy text and your council's local plan before relying on it.