Measured from real Inspectorate decision letters — updated nightly

Appeal Survival Rates

Not every refusal reason is equally fatal. We read thousands of PINS decision letters and measured which contested issues actually survive appeal — nationally and in your authority — plus how often a revised resubmission succeeds instead.

Which refusal reasons survive appeal on extensions in Gateshead Metropolitan Borough Council?

Share of decided appeals raising each issue that were allowed. Higher = softer refusal reason. Authority rates shown where at least 10 decided appeals raise the issue; grey bars are the national baseline.

Refusal reason Gateshead Metropolitan Borough Council National
Principle of development / location no indexed appeals 38.6% (n=145)
Flood risk / drainage no indexed appeals 35.0% (n=103)
Residential amenity (privacy, light, outlook, noise) n=2 — too few to rate 33.6% (n=1,894)
Overdevelopment / cramming no indexed appeals 33.6% (n=128)
Character & appearance / design n=3 — too few to rate 31.7% (n=3,234)
Highway safety / parking no indexed appeals 28.7% (n=247)
Heritage (listed buildings, conservation areas) no indexed appeals 26.9% (n=1,075)
Trees / ecology no indexed appeals 25.7% (n=175)
Green Belt no indexed appeals 23.7% (n=434)
Standard of accommodation / space standards no indexed appeals 23.5% (n=498)
Planning obligations / s.106 no indexed appeals 23.1% (n=26)

Derived from PINS decision letters with extracted text (not every appeal is indexed). A reason being "raised" means the Inspector identified it among the main issues — observational data, not a prediction for any individual scheme.

Refused? Resubmitting often beats appealing

Measured from refusals in our decision corpus that were followed by a fresh application at the same address.

69.1%
of first resubmissions approved nationally (n=1241)
~86 days
typical refusal-to-redecision gap

Not enough measured resubmissions in this authority yet to quote a local rate.

The designation reality check

Measured approval rates for decided applications inside each designation vs the same authorities outside it. The gap is smaller than most people assume — the risk is usually the proposal, not the postcode.

DesignationApproval insideApproval outsideEffect
Conservation area 87.4% (n=5,433) 83.1% +4.3 points
Article 4 area 82.7% (n=6,867) 85.5% -2.8 points
Green Belt 77.6% (n=2,273) 85.4% -7.8 points

National figures across authorities with a full decisions stream; conservation-area and Article 4 rows use precisely-located applications only. Observational, not causal — the mix of what people apply for differs inside designations.

Ask Planning Agent
🧭Guide me