Measured from real Inspectorate decision letters — updated nightly

Appeal Survival Rates

Not every refusal reason is equally fatal. We read thousands of PINS decision letters and measured which contested issues actually survive appeal — nationally and in your authority — plus how often a revised resubmission succeeds instead.

Which refusal reasons survive appeal on hmos?

Share of decided appeals raising each issue that were allowed. Higher = softer refusal reason. Search an authority above to compare it against these national rates.

Refusal reason National
Heritage (listed buildings, conservation areas) 41.2% (n=17)
Overdevelopment / cramming 37.5% (n=8)
Character & appearance / design 31.6% (n=79)
Residential amenity (privacy, light, outlook, noise) 31.2% (n=247)
Standard of accommodation / space standards 28.6% (n=154)
Highway safety / parking 23.8% (n=63)
Flood risk / drainage 22.2% (n=9)
Trees / ecology 20.0% (n=10)
Principle of development / location 0.0% (n=1)
Planning obligations / s.106 0.0% (n=3)

Derived from PINS decision letters with extracted text (not every appeal is indexed). A reason being "raised" means the Inspector identified it among the main issues — observational data, not a prediction for any individual scheme.

Refused? Resubmitting often beats appealing

Measured from refusals in our decision corpus that were followed by a fresh application at the same address.

69.1%
of first resubmissions approved nationally (n=1241)
~86 days
typical refusal-to-redecision gap

Not enough measured resubmissions in this authority yet to quote a local rate.

The designation reality check

Measured approval rates for decided applications inside each designation vs the same authorities outside it. The gap is smaller than most people assume — the risk is usually the proposal, not the postcode.

DesignationApproval insideApproval outsideEffect
Conservation area 87.4% (n=5,433) 83.1% +4.3 points
Article 4 area 82.7% (n=6,867) 85.5% -2.8 points
Green Belt 77.6% (n=2,273) 85.4% -7.8 points

National figures across authorities with a full decisions stream; conservation-area and Article 4 rows use precisely-located applications only. Observational, not causal — the mix of what people apply for differs inside designations.

Ask Planning Agent
🧭Guide me