← 📐 Design Intelligence
📍 Assess for:
Log in to link to a project

Accessibility & Inclusive Design

Part M, M4(2) Accessible, M4(3) Wheelchair Adaptable/Accessible standards screening

Project Overview

Dwelling Features

Select all accessible features provided in the design

Common Areas & Building Features

Select all accessible features in shared spaces

External Areas & Approaches

Select all accessible external features

Policy Requirements

Total Units
0
M4(2) Required
0
M4(3) Required
0
M4(1) Baseline
All

M4(1) Visitable Compliance

M4(1) is the baseline minimum for all new dwellings. Requires level access or suitable entrance, and basic accessible WC.

M4(2) Accessible & Adaptable Compliance

M4(2) standards require accessibility for people with mobility impairments including wheelchair users. Tests 9 key criteria.

0%

    M4(3) Wheelchair Accessible Compliance

    M4(3) standards ensure full wheelchair accessibility with all necessary provisions. Tests 12 comprehensive criteria.

    0%

      Common Areas Accessibility

      0%

        External Areas Accessibility

        0%

          Equality Act 2010 Considerations

          Key requirements under the Equality Act 2010 for reasonable adjustments and accessible environments:

          • Accessible design must not discriminate against people with disabilities
          • Reasonable adjustments required beyond minimum building regulations
          • Anticipatory duty to plan for diverse needs in shared spaces
          • Physical accessibility integral to service delivery for public/commercial uses
          • Staff training on accessible customer service and wayfinding support
          • Consider neurodiverse access needs (sensory, cognitive, mental health)
          • Regular audits and community consultation with disabled users

          Overall Compliance Status

          Note: This assessment is a screening tool based on design information provided. A full technical accessibility audit by qualified specialists and consultation with Building Control is required for planning submission.
          Ask Planning Agent